Skip to main content

Columbia Basin-Grand Coulee Dam Project, Washington. Grand Coulee Dam with left wing of power plant in foreground. Three large generators and two 20,000 station units are now in operation. Six other large generators are to be installed in 1943-1944. Two 75,000 kw. generators from Shasta Dam are to be in operation at Coulee in the Fall of 1942., undated

 Item — Box: PH 11
Identifier: CAC_CC_053_13_11_0000_1603
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.

Dates

  • undated

Language of Materials

English

Conditions Governing Access

Certain series of this collection are stored off-site and require prior notice to access. If you wish to view these materials, please contact the Congressional Archives staff to arrange an appointment.

The following series are stored off-site: Constituent Services, Miscellaneous, and Office Series.

Extent

From the Collection: 335.2 Linear Feet (283 containers)

Repository Details

Part of the Carl Albert Center Congressional and Political Collections Repository

Contact:
630 Parrington Oval
Room 202B
Norman Oklahoma 73109 United States