Columbia Basin-Grand Coulee Dam Project, Washington. Switchyard where the output of the 344,000 kilowatts of power now operating at Grand Coulee Dam is sent to the vast war industries of the Pacific Northwest., undated
Item — Box: PH 11
Identifier: CAC_CC_053_13_11_0000_1606
This series contains 2,331 items and consists of images from throughout the time Elmer Thomas spent in Congress.
Dates
- undated
Language of Materials
English
Conditions Governing Access
Certain series of this collection are stored off-site and require prior notice to access. If you wish to view these materials, please contact the Congressional Archives staff to arrange an appointment.
The following series are stored off-site: Constituent Services, Miscellaneous, and Office Series.
The following series are stored off-site: Constituent Services, Miscellaneous, and Office Series.
Extent
From the Collection: 335.2 Linear Feet (283 containers)
Repository Details
Part of the Carl Albert Center Congressional and Political Collections Repository