Bank Stabilization and Channel Rectification: Short Mountain Dam Site to Wilson Rock, Oklahoma, Arkansas River, 1955 June 30
Item — Folder: 1
Identifier: CAC_CC_031_14_0000_1_43
Area plan of the Bank Stabilization and Channel Rectification portion of the Arkansas River Basin's River and Harbor Project, which includes a vicinity map in the top, right corner. On reverse: Project. The bank stabilization and channel rectification in the reach between Short Mountain Dam site and Wilson Rock, Oklahoma, is an integral unit of the multiple-purpose plan authorized by the River and Harbor Act of July 24, 1946.
Dates
- 1955 June 30
Language of Materials
English
Physical Description
Area plan (orthographic projection); 10 1/2 x 15 3/16 inches; Printed (top, right corner): 1; Inscribed (top, left corner): 50; Shading (red) south of the Arkansas River, north of 35 20N; Inscribed (right, center; red): [Last] floods cut thru Ox bow; Annotated (red) with an arrow pointing from words to area east of 94 40W and at 35 15N.
Conditions Governing Access:
Certain series of this collection are stored off-site and require prior notice to access. If you wish to view these materials, please contact the Congressional Archives staff to arrange an appointment.
The following series are stored off-site: Clippings and Invitations.
The following series are stored off-site: Clippings and Invitations.
Extent
From the Series: 28.42 Linear Feet (9 containers)
Physical Description
Area plan (orthographic projection); 10 1/2 x 15 3/16 inches; Printed (top, right corner): 1; Inscribed (top, left corner): 50; Shading (red) south of the Arkansas River, north of 35 20N; Inscribed (right, center; red): [Last] floods cut thru Ox bow; Annotated (red) with an arrow pointing from words to area east of 94 40W and at 35 15N.
Creator
Repository Details
Part of the Carl Albert Center Congressional and Political Collections Repository