Skip to main content

Red River Basin Development Plan: Projects and Estimated Costs, 1941-01-01 - 1942-12-31

 Item — Box: 15, Folder: 20
Identifier: CAC_CC_010_3_15_20_0001
The text outlines various projects in the Red River Basin aimed at flood control, navigation, power generation, and irrigation. It provides estimated costs, ratios of cost to benefit, and details of each project, including levee extensions, dam protection, and reservoir construction. The comprehensive plan includes the development of storage reservoirs with power installations, irrigation systems, and navigation locks and dams. The total estimated cost for the projects is listed at the end of the text.

Dates

  • 1941-01-01 - 1942-12-31

Language of Materials

English

Conditions Governing Access

Certain series of this collection are stored off-site and require prior notice to access. If you wish to view these materials, please contact the Congressional Archives staff to arrange an appointment.

The Clippings series is stored off-site.

Extent

7 pages

Overview

77th (1941-1943)

Preservica Internal URL

Preservica Public URL Preservica Access

General

Water Resources Development
  • TypeCollection

Repository Details

Part of the Carl Albert Center Congressional and Political Collections Repository

Contact:
630 Parrington Oval
Room 202B
Norman Oklahoma 73109 United States