Skip to main content

The Status of the Atomic Energy Plant at Portsmouth, Ohio, 1953-06-12

 Item — Box: 1, Folder: 23
Identifier: CAC_CC_31_9_1_23_0023
The letter is a response to a request for information about the status of the Atomic Energy plant in Portsmouth, Ohio. The Chief Engineer's office of the Atomic Energy Commission confirmed that the project was active and under construction, contingent on appropriations by Congress. President Eisenhower had requested funds for the project, and it was being constructed in a way that would allow for the use of certain units as they become available. Details about construction schedules were difficult to obtain due to the nature of the plant. The letter provides reassurance that the project is moving forward.

Dates

  • 1953-06-12

Language of Materials

English

Conditions Governing Access:

Certain series of this collection are stored off-site and require prior notice to access. If you wish to view these materials, please contact the Congressional Archives staff to arrange an appointment.

The following series are stored off-site: Clippings and Invitations.

Extent

2 pages

Overview

83rd Congress (1953-1955)

Preservica Internal URL

Preservica Public URL Preservica Access

General

Emergency Management
  • TypeCollection

Repository Details

Part of the Carl Albert Center Congressional and Political Collections Repository

Contact:
630 Parrington Oval
Room 202B
Norman Oklahoma 73109 United States