Annual Report of the Chief of Engineers, U.S. Army: Fiscal Year 1967 - Civil Works Activities
Digital item
Identifier: CAC_CC_001_15_9_3_0001
Dates
- June 30, 1967
- 90th (1967-1969)
Scope and Contents
The text provides a report on the Chief of Engineers, U.S. Army for the fiscal year ended June 30, 1967, focusing on civil works activities related to rivers, harbors, flood control, and beach erosion control. It includes specific project data on the Broken Bow Reservoir in the Red River Basin, Oklahoma, detailing the existing project, authorized work, local cooperation, operations, and results during the fiscal year. The project is 74 percent complete with an estimated cost of $39,600,000.
Creator
Non-Specified
Congress 90th (1967-1969)
Policy Area Water resources development--Law and legislation--United States
Tribal Affiliation Non-Specified
Congress 90th (1967-1969)
Policy Area Water resources development--Law and legislation--United States
Tribal Affiliation Non-Specified
- TypeDeliverableUnit
Repository Details
Part of the Carl Albert Center Congressional and Political Collections Repository