Skip to main content

Power Authorization and Construction at Broken Bow Reservoir, Oklahoma

 Digital item
Identifier: CAC_CC_001_15_9_3_0004

Dates

  • September 13, 1962
  • 87th (1961-1963)

Scope and Contents

The Broken Bow Reservoir Mountain Pork River project in the Red River Basin, Oklahoma, was authorized in 1958 without power. Power was later authorized under Public Law 87.874, Title II--Flood Control. The estimated cost of the project was $23,800,000. The Southwestern Power Administration indicated that they could market power from the hydro plant to recover costs. The Bureau of the Budget stated that power costs should be recovered within 50 years. The responsibility for repayment of power costs rests with the Department of the Interior. The average useful life of hydraulic power production is listed as ranging from 35 to 150 years. The average number of years for amortization of existing power features in multiple-purpose dams and reservoirs is approximately 75 years. Construction work at Broken Bow Reservoir was contracted to Nello Lo Teer for embankment and dike construction.

Creator

Non-Specified

Congress 87th (1961-1963)

Policy Area Water resources development--Law and legislation--United States

Tribal Affiliation Non-Specified
  • TypeDeliverableUnit

Repository Details

Part of the Carl Albert Center Congressional and Political Collections Repository

Contact:
630 Parrington Oval
Room 202B
Norman Oklahoma 73109 United States