Skip to main content

Broken Bow Dam And Reservoir: A Project Overview

 Digital item
Identifier: CAC_CC_001_15_9_3_0003

Dates

  • 87th (1961-1963)

Scope and Contents

The text provides information about the Broken Bow Dam and Reservoir project in Oklahoma, including its geography, purpose, construction progress, features, and operation. The project aims to provide flood control, water supply, hydroelectric power, and recreational opportunities in the Little River Basin. The dam is under construction on the Mountain Fork River and is expected to be completed in 1969 at a cost of $39.6 million. The reservoir will have a capacity of 1,368,000 acre-feet and will offer benefits such as flood protection, water supply, power generation, and recreational activities.

Creator

Non-Specified

Congress 87th (1961-1963)

Policy Area Water resources development--Law and legislation--United States

Tribal Affiliation Non-Specified
  • TypeDeliverableUnit

Repository Details

Part of the Carl Albert Center Congressional and Political Collections Repository

Contact:
630 Parrington Oval
Room 202B
Norman Oklahoma 73109 United States