Skip to main content

Proposed Hydroelectric Power at Broken Bow Reservoir, 1962-01-01 - 1963-12-31

 Item — Box: 9, Folder: 3
Identifier: CAC_CC_001_15_9_3_0005
The text consists of correspondence regarding the proposed reports on the Water Quality Study, Arkansas-Red River Basins, Hugo Reservoir, and Broken Bow Reservoir in Oklahoma. The reports discuss the advisability of including hydroelectric-power facilities at Broken Bow Reservoir and recommend modifications to the project to include fish and wildlife conservation and general recreation. The total estimated cost of the project is $39,600,000 for construction, with local interests required to bear costs for water supply. The Board of Engineers for Rivers and Harbors concurs with the recommendations, and the Chief of Engineers supports including hydroelectric-power facilities at Broken Bow Reservoir.

Dates

  • 1962-01-01 - 1963-12-31

Language of Materials

English

Conditions Governing Access:

Certain series of this collection are stored off-site and require prior notice to access. If you wish to view these materials, please contact the Congressional Archives staff to arrange an appointment.

The following series are stored off-site: Clippings, Invitations, Mail, Miscellaneous, Office, and Post Office.

Requests for Office Series: All requests must be made at the folder level and approved by an archivist prior to research. Materials must be reviewed for personally identifiable information and, if needed, appropriately redacted before the researcher is allowed to view them.

Extent

12 pages

Overview

87th (1961-1963)

Preservica Internal URL

Preservica Public URL Preservica Access

General

Water Resources Development; Energy
  • TypeCollection

Repository Details

Part of the Carl Albert Center Congressional and Political Collections Repository

Contact:
630 Parrington Oval
Room 202B
Norman Oklahoma 73109 United States