Proposed Hydroelectric Power at Broken Bow Reservoir
Digital item
Identifier: CAC_CC_001_15_9_3_0005
Dates
- 87th (1961-1963)
Scope and Contents
The text consists of correspondence regarding the proposed reports on the Water Quality Study, Arkansas-Red River Basins, Hugo Reservoir, and Broken Bow Reservoir in Oklahoma. The reports discuss the advisability of including hydroelectric-power facilities at Broken Bow Reservoir and recommend modifications to the project to include fish and wildlife conservation and general recreation. The total estimated cost of the project is $39,600,000 for construction, with local interests required to bear costs for water supply. The Board of Engineers for Rivers and Harbors concurs with the recommendations, and the Chief of Engineers supports including hydroelectric-power facilities at Broken Bow Reservoir.
Creator
Non-Specified
Congress 87th (1961-1963)
Policy Area Non-Specified
Congress 87th (1961-1963)
Policy Area Non-Specified
- TypeDeliverableUnit
Repository Details
Part of the Carl Albert Center Congressional and Political Collections Repository